DA FORM 7478-R Fillable – Army Pubs 7478-R PDF

DAFORMFILLABLE.COM | DA FORM 7478-R Fillable – Army Pubs 7478-R PDFDA FORM 7478-R, also known as the Chilled Water System Inspection Checklist (LRA), is an essential document used for inspecting and maintaining chilled water systems. This form, published on December 1, 2002, ensures that chilled water systems operate efficiently and safely. It is maintained by the COE (Corps of Engineers) and is currently active.

DA FORM 7478-R – Chilled Water System Inspection Checklist (LRA)

Form Number DA FORM 7478-R
Form Title Chilled Water System Inspection Checklist (LRA)
Form Date 12/1/2002
Form Proponent COE

Purpose of DA FORM 7478-R

The primary purpose of DA FORM 7478-R is to provide a comprehensive checklist for the inspection of chilled water systems. This checklist helps in identifying potential issues, ensuring preventive maintenance, and promoting system reliability and efficiency. Regular use of this form can prevent costly repairs and extend the lifespan of the equipment.

Key Features of DA FORM 7478-R

Detailed Inspection Checklist

DA FORM 7478-R includes a detailed list of inspection items that cover various components of the chilled water system. These items are designed to ensure that every aspect of the system is thoroughly examined. Some of the key inspection points include:

  • Piping and Valves: Checking for leaks, corrosion, and proper insulation.
  • Pumps and Motors: Inspecting for proper operation, alignment, and lubrication.
  • Cooling Towers: Ensuring cleanliness, checking for structural integrity, and verifying water treatment processes.
  • Control Systems: Verifying the functionality of thermostats, sensors, and control panels.

Compliance with Prescribed Directive TM 5-697

The DA FORM 7478-R is prescribed by TM 5-697, which provides detailed guidance on the inspection and maintenance of chilled water systems. This ensures that the inspections conducted using this form adhere to the highest standards of safety and efficiency.

Electronic Media Availability

This form is also available in electronic media, making it easily accessible and user-friendly. The electronic format allows for easier documentation, storage, and retrieval of inspection records.

Importance of Regular Inspections

Preventive Maintenance

Regular use of DA FORM 7478-R for inspections is crucial for preventive maintenance. By identifying and addressing issues early, it helps in avoiding major breakdowns and extending the system’s operational life.

Energy Efficiency

A well-maintained chilled water system operates more efficiently, leading to significant energy savings. Inspections ensure that all components are working optimally, reducing energy consumption and operational costs.

Safety and Reliability

Inspections using DA FORM 7478-R contribute to the overall safety and reliability of the chilled water system. By ensuring that all components are in good condition and functioning correctly, the risk of accidents and system failures is minimized.

Distribution and Accessibility

Public Release and Distribution

DA FORM 7478-R is approved for public release and is distributed without any restrictions. This wide accessibility ensures that all relevant personnel can obtain and use the form as needed.

Security Classification

The form is classified as UNCLASSIFIED, making it accessible to all personnel involved in the maintenance and inspection of chilled water systems.

Conclusion

DA FORM 7478-R – Chilled Water System Inspection Checklist (LRA) is an indispensable tool for maintaining the efficiency, safety, and reliability of chilled water systems. Its comprehensive checklist, adherence to TM 5-697, and availability in electronic media make it a vital resource for preventive maintenance. Regular use of this form ensures that chilled water systems operate at their best, providing significant benefits in terms of energy savings and system longevity.

For more detailed information and to access the form, personnel can refer to the official sources and guidelines provided by the Corps of Engineers. Ensuring regular inspections using DA FORM 7478-R is a proactive step towards maintaining optimal performance and safety of chilled water systems.

DA FORM 7478-R Fillable – Army Pubs 7478-R PDF DOWNLOAD

Download PDF

DA FORM 7478-R - Chilled Water System Inspection Checklist (LRA)