DA FORM 7807 Fillable – Army Pubs 7807 PDF

DAFORMFILLABLE.COM | DA FORM 7807 Fillable – Army Pubs 7807 PDF – The DA FORM 7807, titled Justification For Industrial Mobilization Capacity (IMC) – Eligible Workstations, is a vital document used by the U.S. Army to justify the need for maintaining certain industrial capacities during times of mobilization. This form, with the publication number DA FORM 7807 and a publication date of June 1, 2018, plays a crucial role in ensuring that the Army is prepared to scale up its operations when necessary. The form is proponent by ASA (AL&T), and its status remains active.

DA FORM 7807 – Justification For Industrial Mobilization Capacity (IMC) – Eligible Workstations

Form Number DA FORM 7807
Form Title Justification For Industrial Mobilization Capacity (IMC) – Eligible Workstations
Form Date 6/1/2018
Form Proponent ASA (AL&T)

Purpose and Importance

What is Industrial Mobilization Capacity (IMC)?

Industrial Mobilization Capacity (IMC) refers to the ability of the industrial base to meet the increased demand for goods and services required during military mobilization. This capacity ensures that the necessary resources, facilities, and workforce are available to support military operations in times of crisis.

Role of DA FORM 7807

The DA FORM 7807 is used to provide a detailed justification for designating specific workstations as eligible for IMC. This justification is essential for maintaining readiness and ensuring that the Army can quickly mobilize resources when needed. By identifying and justifying these workstations, the Army ensures that critical industrial capabilities are preserved and can be rapidly activated in times of need.

Key Sections of DA FORM 7807

Section I: Identification of Workstations

This section requires detailed information about the workstations being justified for IMC. It includes the location, type of work performed, and the current status of each workstation. This information is critical for understanding the role of each workstation in the broader context of industrial mobilization.

Section II: Justification for IMC Eligibility

In this section, the proponent must provide a thorough justification for why each workstation should be designated as eligible for IMC. This includes an analysis of the potential impact on military operations if the workstation were not available during mobilization. The justification must be supported by relevant data and strategic assessments.

Section III: Approval and Certification

The final section of the form includes approval and certification by the relevant authorities. This ensures that the justification has been reviewed and approved at the appropriate levels within the Army’s chain of command.

Completing DA FORM 7807

Step-by-Step Instructions

  1. Gather Required Information: Collect all necessary data regarding the workstations, including their location, type of work, and current status.
  2. Provide Detailed Justifications: Use strategic assessments and relevant data to justify why each workstation should be eligible for IMC.
  3. Obtain Approvals: Ensure that the form is reviewed and approved by the appropriate authorities.

Common Mistakes to Avoid

  • Incomplete Information: Ensure all sections of the form are fully completed.
  • Insufficient Justification: Provide robust and data-supported justifications for each workstation.
  • Lack of Approval: Make sure all required approvals and certifications are obtained.

Conclusion

The DA FORM 7807 is a critical document for the U.S. Army, ensuring that industrial mobilization capacities are identified and justified appropriately. By maintaining a ready and capable industrial base, the Army can effectively respond to crises and support military operations. Understanding and properly completing this form is essential for those involved in military logistics and operations planning.

DA FORM 7807 Fillable – Army Pubs 7807 PDF DOWNLOAD

Download PDF

DA FORM 7807 - Justification For Industrial Mobilization Capacity (IMC) - Eligible Workstations