DAFORMFILLABLE.COM | DA FORM 7635 Fillable – Army Pubs 7635 PDF – DA FORM 7635 is a critical tool for the U.S. Army, specifically designed for the self-certification of Wood Packaging Material (WPM) sites. This checklist ensures that WPM sites comply with established standards and regulations. The form, maintained by G-4 and last updated on November 1, 2020, is an essential document in the realm of military logistics and packaging.
DA FORM 7635 – U.S. Army Wood Packaging Material (WPM) Site Self-Certification Auditor`s Checklist
Form Number | DA FORM 7635 |
Form Title | U.S. Army Wood Packaging Material (WPM) Site Self-Certification Auditor`s Checklist |
Form Date | 11/1/2020 |
Form Proponent | G-4 |
Purpose and Importance of DA FORM 7635
The U.S. Army Wood Packaging Material (WPM) Site Self-Certification Auditor’s Checklist serves multiple purposes:
- Ensuring Compliance: The primary objective is to ensure that WPM sites adhere to the regulations set forth in PAM 700-32.
- Self-Certification: This form allows WPM sites to self-certify, promoting efficiency and accountability.
- Standardization: It aids in standardizing procedures across various sites, ensuring uniformity in operations.
Key Features of DA FORM 7635
General Information
DA FORM 7635 is identified by its publication number and date: Pub/Form Number: DA FORM 7635, Pub/Form Date: 11/01/2020. This form replaced the previous version dated January 1, 2008, and is currently active. It is exclusively produced in electronic media, ensuring ease of access and distribution.
Proponent and Distribution
The form is maintained by G-4 and is unclassified, making it widely accessible. It falls under Distribution Restriction Code A, meaning it is approved for public release and distribution is unlimited.
Prescribed Forms and Directives
DA FORM 7635 is prescribed by PAM 700-32. This ensures that all related procedures and guidelines are followed precisely, maintaining high standards of operation.
Structure and Use of DA FORM 7635
Sections of the Checklist
The WPM Site Self-Certification Auditor’s Checklist is divided into several sections, each focusing on different aspects of WPM site operations:
1. Site Identification
This section captures essential details about the WPM site, including location, contact information, and operational specifics.
2. Compliance Verification
Here, auditors check compliance with various regulations and standards. This includes verifying that the site meets the requirements outlined in PAM 700-32.
3. Operational Procedures
Auditors review the operational procedures of the WPM site to ensure they align with prescribed standards. This includes packaging methods, material handling, and storage practices.
4. Training and Documentation
This section ensures that personnel are adequately trained and that all necessary documentation is maintained properly. Proper training and documentation are crucial for the consistent application of standards.
Completing the Checklist
Auditors must complete the checklist thoroughly, providing detailed responses to each section. This ensures that all aspects of the WPM site’s operations are evaluated comprehensively.
Benefits of Using DA FORM 7635
Enhancing Accountability
By using DA FORM 7635, WPM sites can demonstrate their commitment to adhering to regulations. This enhances accountability and transparency in operations.
Improving Efficiency
The self-certification process streamlined by this form allows WPM sites to operate more efficiently. It reduces the need for external audits, saving time and resources.
Ensuring Quality
Consistent use of the WPM Site Self-Certification Auditor’s Checklist ensures that high-quality standards are maintained across all WPM sites. This is crucial for the safe and secure transportation of materials.
Conclusion
DA FORM 7635 – U.S. Army Wood Packaging Material (WPM) Site Self-Certification Auditor’s Checklist is a vital document in ensuring the compliance and standardization of WPM sites. Its structured approach to auditing and self-certification helps maintain high standards in military logistics. By adhering to the guidelines and completing the checklist thoroughly, WPM sites can operate efficiently, transparently, and in full compliance with established regulations.