DA FORM 7635 Fillable – Army Pubs 7635 PDF

DAFORMFILLABLE.COMDA FORM 7635 Fillable – Army Pubs 7635 PDFDA FORM 7635 is a critical tool for the U.S. Army, specifically designed for the self-certification of Wood Packaging Material (WPM) sites. This checklist ensures that WPM sites comply with established standards and regulations. The form, maintained by G-4 and last updated on November 1, 2020, is an essential document in the realm of military logistics and packaging.

DA FORM 7635 – U.S. Army Wood Packaging Material (WPM) Site Self-Certification Auditor`s Checklist

Form Number DA FORM 7635
Form Title U.S. Army Wood Packaging Material (WPM) Site Self-Certification Auditor`s Checklist
Form Date 11/1/2020
Form Proponent G-4

Purpose and Importance of DA FORM 7635

The U.S. Army Wood Packaging Material (WPM) Site Self-Certification Auditor’s Checklist serves multiple purposes:

  • Ensuring Compliance: The primary objective is to ensure that WPM sites adhere to the regulations set forth in PAM 700-32.
  • Self-Certification: This form allows WPM sites to self-certify, promoting efficiency and accountability.
  • Standardization: It aids in standardizing procedures across various sites, ensuring uniformity in operations.

Key Features of DA FORM 7635

General Information

DA FORM 7635 is identified by its publication number and date: Pub/Form Number: DA FORM 7635, Pub/Form Date: 11/01/2020. This form replaced the previous version dated January 1, 2008, and is currently active. It is exclusively produced in electronic media, ensuring ease of access and distribution.

Proponent and Distribution

The form is maintained by G-4 and is unclassified, making it widely accessible. It falls under Distribution Restriction Code A, meaning it is approved for public release and distribution is unlimited.

Prescribed Forms and Directives

DA FORM 7635 is prescribed by PAM 700-32. This ensures that all related procedures and guidelines are followed precisely, maintaining high standards of operation.

Structure and Use of DA FORM 7635

Sections of the Checklist

The WPM Site Self-Certification Auditor’s Checklist is divided into several sections, each focusing on different aspects of WPM site operations:

1. Site Identification

This section captures essential details about the WPM site, including location, contact information, and operational specifics.

2. Compliance Verification

Here, auditors check compliance with various regulations and standards. This includes verifying that the site meets the requirements outlined in PAM 700-32.

3. Operational Procedures

Auditors review the operational procedures of the WPM site to ensure they align with prescribed standards. This includes packaging methods, material handling, and storage practices.

4. Training and Documentation

This section ensures that personnel are adequately trained and that all necessary documentation is maintained properly. Proper training and documentation are crucial for the consistent application of standards.

Completing the Checklist

Auditors must complete the checklist thoroughly, providing detailed responses to each section. This ensures that all aspects of the WPM site’s operations are evaluated comprehensively.

Benefits of Using DA FORM 7635

Enhancing Accountability

By using DA FORM 7635, WPM sites can demonstrate their commitment to adhering to regulations. This enhances accountability and transparency in operations.

Improving Efficiency

The self-certification process streamlined by this form allows WPM sites to operate more efficiently. It reduces the need for external audits, saving time and resources.

Ensuring Quality

Consistent use of the WPM Site Self-Certification Auditor’s Checklist ensures that high-quality standards are maintained across all WPM sites. This is crucial for the safe and secure transportation of materials.

Conclusion

DA FORM 7635 – U.S. Army Wood Packaging Material (WPM) Site Self-Certification Auditor’s Checklist is a vital document in ensuring the compliance and standardization of WPM sites. Its structured approach to auditing and self-certification helps maintain high standards in military logistics. By adhering to the guidelines and completing the checklist thoroughly, WPM sites can operate efficiently, transparently, and in full compliance with established regulations.

DA FORM 7635 Fillable – Army Pubs 7635 PDF DOWNLOAD

Download PDF

DA FORM 7635 - U.S. Army Wood Packaging Material (WPM) Site Self-Certification Auditor`s Checklist