DA FORM 7467-R Fillable – Army Pubs 7467-R PDF

DAFORMFILLABLE.COM | DA FORM 7467-R Fillable – Army Pubs 7467-R PDF – DA FORM 7467-R, also known as the Main Power Energization Checklist (LRA), is a critical document used by the U.S. Army Corps of Engineers (USACE). This form ensures that all necessary steps are followed before energizing main power systems. Published on August 1, 2002, it remains an active form and is available in electronic media. This guide provides an in-depth look into the form’s purpose, structure, and usage.

DA FORM 7467-R – Main Power Energization Checklist (LRA)

Form Number DA FORM 7467-R
Form Title Main Power Energization Checklist (LRA)
Form Date 8/1/2002
Form Proponent USACE

Purpose of DA FORM 7467-R

Ensuring Safety and Compliance

The primary purpose of DA FORM 7467-R is to guarantee the safe and compliant energization of main power systems. By following the checklist, personnel can systematically verify that all safety protocols and operational procedures are in place. This reduces the risk of electrical hazards and ensures the integrity of the power system.

Facilitating Accountability

Using this form, the USACE ensures accountability by documenting each step taken during the energization process. This record can be crucial for future inspections, troubleshooting, and audits, providing a clear trail of actions and verifications.

Structure of DA FORM 7467-R

Form Details and Identification

DA FORM 7467-R includes several key identifiers and classifications:

  • Pub/Form Number: DA FORM 7467-R
  • Pub/Form Date: 08/01/2002
  • Pub/Form Title: Main Power Energization Checklist (LRA)
  • Pub/Form Proponent: USACE
  • Pub/Form Status: Active
  • Prescribed Forms/Prescribing Directive: None
  • Security Classification: Unclassified
  • Distribution Restriction Code: A (Approved for public release; distribution is unlimited)
  • Pub/Form IDN: 990001
  • Pub/Form PIN: 080392

Checklist Sections

The checklist itself is divided into various sections, each focusing on specific aspects of the energization process. These sections typically include:

  • Pre-Energization Checks: Ensuring all initial conditions are met.
  • Operational Verifications: Confirming that equipment and systems are functioning correctly.
  • Safety Protocols: Verifying that all safety measures are in place and operational.

Using DA FORM 7467-R

Step-by-Step Procedure

Personnel must follow a step-by-step procedure outlined in the checklist. Each step requires an initial or signature, ensuring that no step is skipped or overlooked. This methodical approach helps in maintaining high safety standards and operational efficiency.

Documentation and Record-Keeping

Proper documentation and record-keeping are essential when using DA FORM 7467-R. Completed forms should be filed and stored as per the USACE guidelines. These records serve as evidence of compliance and can be referenced during inspections or incident investigations.

Importance of DA FORM 7467-R in Professional Activities

Enhancing Operational Efficiency

By utilizing DA FORM 7467-R, organizations can enhance their operational efficiency. The structured approach ensures that all necessary checks are completed systematically, reducing downtime and preventing potential issues.

Ensuring Regulatory Compliance

Compliance with regulatory standards is crucial in any power energization process. DA FORM 7467-R helps organizations meet these standards by providing a comprehensive checklist that covers all critical aspects of the process.

Conclusion

DA FORM 7467-R – Main Power Energization Checklist (LRA) is an invaluable tool for ensuring the safe and efficient energization of main power systems. Its structured format, combined with detailed step-by-step procedures, helps organizations maintain high safety standards and regulatory compliance. For more information or to access the form, visit the USACE official website.

By understanding and properly utilizing DA FORM 7467-R, professionals can significantly improve their operational practices, ensuring both safety and efficiency in their power energization processes.