DA FORM 7307-R Fillable – Army Pubs 7307-R PDF

DAFORMFILLABLE.COM | DA FORM 7307-R Fillable – Army Pubs 7307-R PDFDA FORM 7307-R, also known as the Cost Estimating Worksheet-Facility Alteration (LRA), is an essential document used by the United States Army Corps of Engineers (USACE). This form, with the publication date of April 1, 1994, plays a critical role in planning and executing facility alterations within military installations. This article aims to provide a comprehensive overview of DA FORM 7307-R, detailing its purpose, structure, and usage, while ensuring clarity and accessibility through effective SEO practices.

DA FORM 7307-R – Cost Estimating Worksheet-Facility Alteration (LRA)

Form Number DA FORM 7307-R
Form Title Cost Estimating Worksheet-Facility Alteration (LRA)
Form Date 4/1/1994
Form Proponent USACE

Purpose of DA FORM 7307-R

The primary function of DA FORM 7307-R is to facilitate the accurate estimation of costs associated with facility alterations. This worksheet aids in budgeting and financial planning, ensuring that all necessary expenses are accounted for before the commencement of any alteration projects. The form is unclassified and approved for public release, making it widely accessible for authorized personnel involved in facility management and project planning.

Structure of DA FORM 7307-R

Key Sections of the Form

DA FORM 7307-R is designed to capture detailed cost information, divided into several sections:

  1. Project Identification: This section includes fields for the project number, location, and description, providing a clear overview of the alteration project.
  2. Cost Estimation Details: Here, users can input specific cost items such as materials, labor, equipment, and subcontractor expenses. Each entry allows for a detailed breakdown to ensure comprehensive coverage of all potential costs.
  3. Summary and Totals: The final part of the form aggregates all individual costs, providing a total estimated cost for the facility alteration project.

Electronic Availability

The form is also produced in electronic media, identified by the Pub/Form IDN 990001 and Pub/Form PIN 072534. This electronic availability ensures ease of use and accessibility, allowing project managers to fill out and share the form digitally.

Usage of DA FORM 7307-R

Application in Project Planning

DA FORM 7307-R is instrumental during the planning phase of facility alterations. It helps project managers and engineers to:

  • Accurately estimate costs: By providing a structured format, the form ensures that all aspects of the project are considered, reducing the likelihood of unforeseen expenses.
  • Ensure budget compliance: The detailed cost breakdown helps in aligning the project with available budgets, preventing cost overruns.
  • Facilitate approvals: A well-documented cost estimation is crucial for obtaining necessary approvals from higher authorities, ensuring that the project can proceed without delays.

Distribution and Classification

The form is approved for public release, with a distribution restriction code of A, meaning its distribution is unlimited. This unrestricted access allows all relevant personnel to utilize the form effectively, ensuring that cost estimation processes are standardized across various projects.

Importance of Accurate Cost Estimation

Accurate cost estimation is vital for the successful execution of facility alteration projects. It ensures that:

  • Resources are optimally allocated: Proper estimation helps in allocating resources efficiently, avoiding wastage and ensuring that all necessary materials and labor are available.
  • Projects stay within budget: By predicting costs accurately, project managers can avoid financial pitfalls and ensure that the project remains financially viable.
  • Stakeholders are informed: Clear and detailed cost estimations provide transparency, keeping all stakeholders informed and aligned with the project’s financial expectations.

Conclusion

DA FORM 7307-R – Cost Estimating Worksheet-Facility Alteration (LRA) is an indispensable tool in the realm of facility management within the military. Its structured approach to cost estimation not only aids in meticulous project planning but also ensures financial accountability and transparency. By leveraging this form, project managers can enhance the efficiency and effectiveness of facility alteration projects, ultimately contributing to the betterment of military infrastructure.

For more information or to access DA FORM 7307-R, authorized personnel can visit the relevant USACE resources or obtain the form through official military channels.

DA FORM 7307-R Fillable – Army Pubs 7307-R PDF DOWNLOAD

Download PDF

DA FORM 7307-R - Cost Estimating Worksheet-Facility Alteration (LRA)